İZMİR - İSTANBUL VIADUCT PROJECT

The fire building, mechanical room, hydrofil group installations, all of the fire installations and 3.000 meters of ductile pipe manufacturing belonging to the viaduct found in the entrance of Osmangazi Bridge had been carried out. However, the mechanical room construction, all the pump groups found in the room, water tank installation and mainline connections had been also carried out.

 

This project is proud of us since the ductile lines and embossed fiberglass isolation on the heat-trace heater had been applied on both of the sides on the viaduct.

OTHER PROJECTS

online katalog