ISTANBUL AIRPORT

Fire installations, heating lines, HVAC installations and plumbing manufacturing have been carried out in certain areas belonging to the ongoing 3rd Airport. Piping manufacturing belonging to 30,000 meters of existing fire and hot water lines, 18,000 m² of duct manufacturing and equipment installation found on these lines have been completed.

 

Hare, Duty-Free takes place as the employer, and Erya Müşavirlik company has carried out all quality control, manufacturing, approval and follow-up processes on behalf of the employer. Here, method studies before manufacturing, shop drawing approvals and material approvals have been carried out through Erya company.

 

This project, which requires serious experience and knowledge on the subject of implementation due to the field conditions and the size of the application area, the large number of employees and the difficulty of mobilization conditions, is a proud for us and our country.