GÜBRETAŞ PHOSPHORIC AND SULFURIC ACID PIPELINE PROJECT
Finished Date:
Jun 2024
Category:
COMPLETED PROJECTS
Client: last
Place: KORFEZ/KOCAELI
Within the scope of industrial mechanical piping, 100% Non-Destructive Testing (NDT) controlled stainless pipe, steel pipe, U-PVC piping works as well as the installation and commissioning of pump groups have been completed by us.